Quote:
Originally Posted by Justin
For now, "limit project length" is defined as the total length of the project, not the time at which the project ends (we can look at changing that but how to handle existing projects may be tricky, need to check some things)
|
ok. FYI this caused an awkward situation where one of my live show projects ended prematurely due to a negative time project startpoint and a project length of N. it was bad, clipped off a part of the song that everyone was expecting and gave the crowd blue balls.
an additional "project end time" param that could act as an "either or" to the "project length" param would be much appreciated and wouldn't interfere with existing projects.