View Single Post
Old 07-02-2019, 10:44 AM   #35
MRMJP
Human being with feelings
 
MRMJP's Avatar
 
Join Date: May 2016
Location: Milwaukee, WI USA
Posts: 1,888
Default

Quote:
Originally Posted by schwa View Post
Those options both exist already, no? Item time vs source time.
I have to dig in more I suppose. But let's say you have a 4 minute item that starts at 20 minutes on the project timeline.

Then you trim 5 seconds off the start of it.

Is it currently possible to see both the original item time, and the trimmed item time?

If so, that's great. If not, I can think of some cases where this would be helpful but even what you've added so far is a huge improvement.

Ability to switch the main time counter to region time instead of project time would also be helpful.

I have a HeDa script that can pop up either an item timecode box, or region timecode box but it can be a little touchy and tricky to keep it visible.
__________________
iMac Pro 3.0GHz 10-Core 64GB RAM SSD MacOS 10.14.6 RME AES HDSPe
Mac Mini 3.2 GHz Intel Core i7 (6-Core) 32GB RAM SSD MacOS 10.14.6 RME AES HDSPe
https://www.mysteryroommastering.com/ - https://www.justincarlperkins.com/
MRMJP is offline   Reply With Quote